INNOVATORS IN MICROTUNNELING

Building = Learning

We build, and we foster the next generation of world-class engineers. We only outsource what we absolutely have to. That way, our engineers gain hands-on experience with a wide array of engineering principles and disciplines, making them valuable in organization.

2024-2025 Season

NoDiggity V2 was our first time building a horizontal tunnelling machine.

It used a 2.2 kNm gearmotor and could acheive a peak thrust of 50kN with an electric screwjack.

fnear-removebg-preview.png

The 2024-25 Season

2023-2024 Season

NoDiggity V1 was our scrappy introduction to microtunneling.

A half-meter diameter verticle bore, it uses NEMA23 motors to thrust into the soil

Screenshot_2024-11-26_223834-removebg-preview.png

The 2023-24 Season

ph_logo-removebg-preview.png

University City, Philadelphia, PA 19104

SUBSCRIBE

Sign up to our newsletter to receive monthly design updates.

© 2025 by Penn Hyperloop

  • X
  • LinkedIn
  • Instagram
  • Youtube
bottom of page